Towngas SLB likely to miss target with 25bps step-up

2 minute read

Download full paper (0.1mb)

Towngas Smart Energy’s USD SLB has reached its December 2025 observation date, with verification due by 30 April 2026. Disclosed photovoltaic (PV) capacity in its 2025 annual results meeting remains materially below target, indicating a likely miss of the Sustainability Performance Target (SPT).

The bond includes a 25bp coupon step-up if targets are not met, but given the short remaining tenor, the pricing impact is limited and not clearly reflected in current trading levels.